Project Notes

  • Fall 2007 through spring 2009
  • PTC designed and engineered
  • Includes 4 annex bins of approximately 800,000 bushel capacity
  • High throughput design, able to load 112 cars in 8 hours
  • PTC handled all aspects of construction, including slipform and structural steel